City of Longwood Seeks Match Funding for Flood-Prone Lift Stations

Municipality applies for HUD grant to cover 25% local share of FEMA-funded sanitary infrastructure retrofit project.

Generic image of industrial infrastructure components and construction materials on a site.
AI

Generic image of industrial infrastructure components and construction materials on a site.

The City of Longwood has announced plans to apply for $91,597 in state match funding to support a federal grant project aimed at retrofitting three flood-prone sanitary lift stations to prevent sewage backups and ensure public safety.

Key points

  • $91,597 in local match funding requested from HUD
  • Three lift stations targeted for elevation and retrofit
  • Project addresses flood vulnerability in Seminole County
  • Public comments accepted until December 11, 2026
The city has already been awarded funding through the Federal Emergency Management Agency’s (FEMA) Hazard Mitigation Grant Program (HMGP), administered by the Florida Division of Emergency Management. This federal award covers 75% of the costs for the Infrastructure Retrofit of 3 Flood-Prone Sanitary Lift Stations Project. To satisfy the required 25% local match, the city anticipates applying for funds through the Rebuild Florida Hurricane Ian Hazard Mitigation Grant Match Program (HMGMP), which is funded by the U.S. Department of Housing and Urban Development (HUD) and administered by the Florida Department of Commerce.
The project targets three specific facilities vulnerable to flooding during severe weather events: Lift Station #3 at 750 South US HWY 17-92, Lift Station #10 at 971 Burlwood Court, and Lift Station #23 at 490 East SR 434. When these facilities flood, they may fail or shut down, compromising public safety and causing sewage backups throughout the city. Improvements will include elevating critical components above the 100-year Base Flood Elevation, such as driveways, valve vaults, wet wells, and control panels, along with site grading, reinforced concrete construction, and electrical upgrades.
Seminole County is identified by HUD as a Most Impacted or Distressed (MID) area due to Hurricane Ian, making the City of Longwood eligible for the HMGMP funds. The project must align with CDBG-DR and FloridaCommerce requirements, including demonstrating compliance with all applicable regulations and verifying no duplication of benefits. The infrastructure retrofit falls under the Infrastructure Protection Measures category of CDBG-DR activity eligibility.
The city is encouraging written public comments and feedback regarding the proposed project and grant application. Comments must be received by 3:00 PM on Friday, December 11, 2026. Submissions should be directed to Mr. Shad Smith, P.E., Public Works Director/City Engineer, at 907 East State Road 434, Longwood, Florida 32750, by phone at 407-260-3447, or via email at ssmith@longwoodfl.org. All comments will be considered by the city and subsequently submitted to FloridaCommerce.
Based on information from the official source: Longwood city (23/11/2026)